Lake Superior School District

Project Details:

In November 2021, Lake Superior School District residents approved $44.1 million to expand educational spaces and make critical infrastructure upgrades at both William Kelley School and Minnehaha Elementary, as well as various updates at Two Harbors High School.

This project featured the following improvements across the following district’s facilities:

William Kelley School

  • Demolish the music wing and replace it with a two-story wing with classrooms for the arts, natural sciences, and family and consumer sciences (FACS).
  • Relocate the main office to create a secured entrance.
  • Improve the woods and metals area to improve power access and ventilation for modern equipment.
  • Renovate and expand the district’s bus garages in Silver Bay and Two Harbors.
  • Various deferred maintenance items, including security, LED lighting, boiler replacement, tuckpointing, roofing, asbestos removal, kitchen equipment replacement, locker rooms, ADA accessibility, and more.

Minnehaha Elementary

  • Renovate and expand the school to serve PreK through grade 5 students to provide appropriate learning spaces.
  • Renovate all classrooms to improve technology, storage, and lighting.
  • Build a new 9,000 SF addition to include a cafeteria, kitchen, and two classrooms to alleviate congestion, expand learning spaces, and right-size other spaces.
  • Move the main entrance to the southern part of the building to create an appropriately-sized main office adjacent to the secure vestibule.
  • Various deferred maintenance items, including security, LED lighting, roofing, exterior doors, building systems, tuckpointing, and more.

Two Harbors High School

  • Create a dedicated, secure entrance. Convert the existing locker bay area to a flexible learning area.
  • Various deferred maintenance improvements, including LED lighting, security, pavement, building systems and controls, and pool filtration.
  • District-Wide
  • Anticipated Fall 2024
  • $44.1 million
  • Planning, referendum communications, project development, and construction management services
  • Natalie Hoff, Kevin Wormuth, Ekalath Sophaphanh, Jeff Schiltz, Brett Baldry, Andrew Faulkner, Raeann Wynn, Ashlie Kuehn and Glenn Chiodo
  • Wold Architects and Engineers, CMTA, Inc., and Northland Consulting Engineers

Photography Credit: SILVERMAN BE REMARKABLE